TSL High Care Construction
       
 



Small Scale Manufacturing Facility

Ware
£ 3.5 Million

The project comprises of the construction of a new small scale manufacturing facility within a newly created fallow space in the existing tablet manufacturing facility.



Cleanroom Manufacturing Facility

Nottingham
£ 1.2 Million

TSL Projects completed the construction of a new 2 storey Manufacturing Cleanroom facility for Reckitt Benckiser Healthcare Ltd at Nottingham including a 2 storey extension.
The facility houses a modern process system and manufacturing equipment to produce a new version of a leading analgesic.
The mechanical plant and electrical equipment are located on the Plant Deck area above the new Cleanroom mezzanine roof.



Unit 35 Upgrade

Deeside
£ 1Million

Cleanroom refurbishment for medical device manufacture



IBC Washing Facility

Barnstaple
£ 0.8 Million

TSL Projects designed and constructed a new IBC Washing Facility (Intermediate Bulk Container) within the Barnstaple factory. To house a new client purchased IBC bin washing machine.

Upgrading and expansion of an existing facility within the heart of a production area was logistically challenging. All of the HVAC plant and equipment was installed in the plant room above the area. Availability of space was at a premium and various enabling and tie in works were required to make way for the new equipment.



New Meat Products Facility

Northampton
£ 12 Million

New Production Facility for a complete range of cooked bacon products



New Dairy Facility

Jersey
£ 9.5 Million

£9.5 M design and build of a new greenfield dairy by TSL Projects